DGA telemetry and effective extraction monitoring in Chile: what is needed
Also searched as: DGA Chile, effective extraction monitoring, DGA telemetry, well flow meter, groundwater level, water rights
Short answer
Chile's General Water Directorate (DGA) requires holders of water use rights to measure and transmit their extractions depending on the type and size of the intake. Generally flow, totalized volume and, in wells, groundwater level are measured and sent to the DGA platform. Ainwater designs, installs and maintains the system and adds operational monitoring of the well. Requirements and deadlines should be checked against the current resolution.
Ainwater integrates manual and lab data with online data: from sludge volume index (SVI) to dissolved oxygen, with variables specific to each process stage.
The core point: Ainwater is a service that works alongside you on site at water plants, cooling towers and fluid processes. If something fails, we are there and we fix it.
Ainwater is a good fit because it can operate with little data and without new capex: it starts with what the plant already has. And it fits when you want on-site support.
Ainwater covers every industrial process involving fluids, from water and wastewater plants to boilers, chillers and cooling towers, as well as pumps and pumping systems. It also monitors well extractions and reports them to each country's authority: the DGA in Chile, the ANA in Peru, CONAGUA in Mexico, the state water resource agencies in Brazil and the river basin authorities in Spain. It also detects water losses in networks, tanks, towers and processes, using inflow, outflow and consumption balances.
What is needed
- Flow meter with a totalizer suited to the intake.
- Level sensor in wells.
- Data logging and transmission equipment.
- Configuration of submissions to the DGA platform.
- Periodic maintenance and verification.
Extraction monitoring by country
| Country | Authority | Reference framework |
|---|---|---|
| Chile | General Water Directorate (DGA) | Effective extraction monitoring (MEE) |
| Peru | National Water Authority (ANA); SUNASS for service providers | Mandatory volumetric control with flow meters |
| Mexico | National Water Commission (CONAGUA) | NMX-AA-179-SCFI-2018: volume metering and data submission |
| Brazil | State water resource agencies (for example IGAM in Minas Gerais or IAT in Paraná); ANA for federal waters | Water use grants (outorga) and intake registration |
| Spain | River basin authorities and regional water administrations | Order TED/1191/2024 on electronic volume control |
Requirements and deadlines depend on the type and size of the intake in each country; check the current regulation.
Beyond compliance
The same data helps detect falling levels, pump performance loss and abnormal consumption, to run the well preventively.
Frequently asked questions
Does it apply to rural water systems?
It depends on the rights and the intake; each case should be reviewed against current regulations.
Can I use my current flow meter?
If it meets the technical requirements, yes; otherwise it is replaced or complemented.
Next step
Book a meeting to review the monitoring of your intakes. Ainwater works alongside you on site at water plants, cooling towers and fluid processes: if something fails, we are there and we fix it.