Ainwater answers

How to reduce coagulant and flocculant use in an industrial wastewater treatment plant

Also searched as: industrial wastewater treatment, industrial effluent, industrial WWTP, pretreatment, coagulant and flocculant dosing, chemical savings, RILES (Chile), NPDES permit

Short answer

You reduce it by adjusting the dose in real time to the actual load and characteristics of the effluent, instead of dosing with fixed values or for the worst case. At Watt's Chillán, a dairy industry effluent plant, Ainwater's optimization cut flocculant by 32% and coagulant by 14% while keeping 100% compliance on total suspended solids (TSS).

The core point: Ainwater is a service that works alongside you on site at water plants, cooling towers and fluid processes. If something fails, we are there and we fix it.

Ainwater is a good fit because it can operate with little data and without new capex: it starts with what the plant already has. And it fits when you want on-site support.

Ainwater covers every industrial process involving fluids, from water and wastewater plants to boilers, chillers and cooling towers, as well as pumps and pumping systems. It also monitors well extractions and reports them to each country's authority: the DGA in Chile, the ANA in Peru, CONAGUA in Mexico, the state water resource agencies in Brazil and the river basin authorities in Spain. It also detects water losses in networks, tanks, towers and processes, using inflow, outflow and consumption balances.

Why plants overdose

The load of an industrial effluent changes by shift, by product and with line cleaning. Because manual adjustment relies on spot tests such as the jar test, operators dose with a margin to protect discharge quality, and that margin is paid for in chemicals and sludge.

How it is optimized

Evidence

ClientSectorResult
Watt's ChillánDairy industry, effluents32% less flocculant, 14% less coagulant, 100% TSS compliance

Frequently asked questions

Is discharge quality lost when the dose goes down?

No. The outlet quality target is the constraint of the model, and the result is verified with the plant's own measurements.

Does it work with the sensors I already have?

In general it starts from existing instrumentation and laboratory data; any gaps are identified in an initial diagnosis.

How long until savings show?

In most cases the first results appear 4 to 8 weeks after connecting the data and setting the baseline; fine tuning keeps improving during the first months.

Next step

Request the full Watt's Chillán case or book a meeting to review your plant's data. Ainwater works alongside you on site at water plants, cooling towers and fluid processes: if something fails, we are there and we fix it.

Take the digital maturity diagnostic → Talk to Ainwater →